Showing posts with label hydroelectric power. Show all posts
Showing posts with label hydroelectric power. Show all posts

Sunday, April 19, 2009

The Lipscomb memorial hydroelectric boondoggle dam

The hydo-power pink elephant

The latest on the Estabrook dam issue. Milwaukee County Supervisor Lipscomb introduced a proposal to repair the stoplog structure on the spillway section of the dam, which was passed unanimously by the PEE committee and now moves on to the entire county board. The aim is that the stoplog repair will allow the filling of the impoundment behind the dam thus providing the desired water level for boating. The WDNR has stated that the dam needs much more attention and repair than simply replacing the missing stoplog structures. They will likely issue an order to prevent filling of the impoundment unless all ordered repairs are completed.

The supervisors will also vote on whether to put out an RFP for debris removal.

The other amendment attached to the $5,000.00 stoplog repair calls for a study of the potential of the dam being modified or replaced to generate hydroelectric power.

Who can spot the pink elephant?

The Milwaukee River is a spate river defined by a spring flow at its headwaters, and a huge watershed that drains 882 square miles in 6 counties. It is dominated by rainfall and snowmelt runoff. It fluctuates wildly between 100 cfs (cubic feet per second) in low summer flows, to over 9,000 cfs in flood events. Its flow often increases by ten to twenty times after a significant rainfall.

Rivers of this character are poor candidates for hydroelectric generation. The wildly fluctuating flows would leave the generator dry at low flow, and overwhelm it after rainfall. The way man has historically tried to tame rivers of this sort is to build an impoundment behind the dam to build up the supply of water so that more constant flow can be maintained. The impoundments are not small such as the 100 acre Estabrook impoundment, but must be larger and deeper in order to be cost effective. The impoundment would most likely have to be increased in size, possibly necessitating the relocation of those very residents calling for the dam’s preservation.

In addition, a larger deeper impoundment is going backwards in environmental terms. Any hydroelectric generation would have to pass strict federal standards, and undergo environmental impact studies, which it never would.

I think a study is actually a good idea if conducted properly. It would lay to rest any debate concerning feasibility of hydroelectric generation for good.

Mr. Lipscomb is grasping at any straw he can to get his way in this very personal fight for him. His Maternal grandfather operated the dam for a period.

What’s next… painting the dam green in order to pass it off as a boon to the environment?
A fresh coat of paint and a sign stating "Estabrook Eco-dam" should solve all the issues...